01753 364109

double deep racking - warehouse storage solutions

Racking

Double Deep Racking

Double deep racking is an efficient way to achieve maximum storage capacity, it is a variant on standard adjustable pallet racking and the perfect solution for storage of multiple pallet quantities of the same product.

Double deep racking allows pallets to be stored two deep, but still accessible from the same aisle. By reducing the number of access aisles, floor space availability is increased meaning a potential increase in pallet storage by up to 50%, the double-deep configuration provides a highly space-efficient solution, along with a variety of beam lengths available we can maximize your pallet storage capacity. Aisle widths vary from 2500mm to 4000mm – we will liaise with your preferred fork truck supplier to gain the required information.

A specialist truck with either slide fork attachments or dual pantograph will be required in order to access the pallets on double deep racking, we have supplied this solution to many customers who have been delighted with their return on investment and have converted multiple units to suit the double deep system.

Why have double deep racking:

  • Storing several pallets of each type of product
  • High turnover stock
  • High density, cost effective storage

Benefits:

  • Maximise storage space
  • Achieve high levels of productivity
  • Maintain good selectivity
  • Reduce damage

book your free site visit button

  • Get A Pallet Racking Budget Quote

    Complete our short ONLINE QUOTE FORM and a member of the team will get back to you within 24 hours. Alternatively call us on 01753 364109.

  • Testimonials

    STS have become a trusted partner designing & building our mezzanines. Nothing is too complex & STS offer a cost effective solution to any design problem. Rohan Masson-Taylor Chairman, Cadogan Tate group

    STS have executed the plans perfectly and on time to our great satisfaction. We wholeheartedly recommend them to any prospective customers. Sham Director, Watch Shop Ltd

    STS were appointed to handle the mezzanine floor planning, regulatory approval, installation & office fit out. I would have no hesitation in giving STS the highest recommendation & would be proud to show any potential customers around our re-developed premises. Fraser Ritchie Managing Director, V C Saunders Engineering

    I only have to brief STS once & it all happens to a very high standard, without the need to chase & moan which is a great help to McLaren. Derek Waelend McLaren Formula 1

    STS understand our requirements & get it right first time. They're on price, deliver to the agreed schedule & the quality of their work is why we continue to use them. Terry Maywood Group Logistics Director, Ryman Limited

    The guys were really helpful and patient. We managed to have a functioning warehouse on time; which in light of the volume we had to do is amazing. Carmel Cully Leica Geosystems Ltd

    STS delivered our warehouse racking and bespoke mezzanine floor to a very high standard, on time and on budget. They were great to work with, and really happy with the results - highly recommended. Ali Crichton State Side Skates

    STS have had a major impact on transforming our multiple warehouses. Service and professionalism shown from the moment you ask for a site visit. Service is unrivalled. Abas Gjutaj Plant Manager, J. Coffey Plant Ltd

    First class service from design to completion, working closely with our team all the way through the project, without disturbance to our production area. I would recommend STS without hesitation. Richard Buxcey Plant and Maintenance Manager, Farecla

    I want to express my delight in the timely & efficient manner in which the mezzanine supply & install was achieved. From initial consultation to final install all staff were very helpful and I would thoroughly recommend your company. William Oliveri Director

    I would like to pass on my thanks to your 2 fitters for yesterday, they were very professional & worked well. I asked them to make a couple of changes to the original design and this was no problem. Jim Marsland Plant Services Manager, AP JNP

    The work has been delivered very well and we are very happy with the end result. I was advised that your site team were very professional and ensured the installation was nothing short of good quality - so please extend this to them too. Thank you Ritchie Gentles Assistant Project Manager - Track Delivery Unit